Tendering assistance and material takeoffs cover most of what happens between a drawing set landing on a desk and a bid going out the door. Neither one is glamorous work, and neither one is ever fully finished — there's always another line to check.
Public agencies advertise construction work the same way they advertise most things — through an open solicitation anyone can respond to. It's a crowded field: construction sits alongside categories like IT and hardware, lab equipment, telecommunications, and furniture as one of the segments with the most postings on the market at any given time, spanning both local and federal opportunities.
We won't catch every relevant posting, and we don't claim to. What we try to do is take the ones we do pursue seriously — reading the solicitation closely, organizing the submission, and making sure nothing obvious gets left out before it goes to a reviewer.
| Item | Unit | Qty |
|---|---|---|
| Excavation | CY | 0 |
| Concrete Footings | CY | 0 |
| Structural Steel | TON | 0 |
| Reinforcement | TON | 0 |
| Formwork | SF | 0 |
| Doors, Supply & Install | EA | 0 |
| Site Fencing | LF | 0 |
| Mobilization | DAYS | 0 |
A bill of quantities lists what a project actually requires, item by item — measured in whatever unit fits the work: count, length, area, volume, weight, or time. Getting there means going through the drawings and specs closely enough to measure what's actually shown, not what's assumed.
It's used differently depending on the contract and the stage of the project, pre-contract or post, but the underlying task stays the same. It's detailed work, and detailed work leaves room for a missed line here or there — which is part of why a second pass matters as much as the first.
From the first read of a tender to the final handshake — we stay on the job.
Start Your Estimate